THRONTONHALL PROJECT
This upgrade project was started in late 2023, when the existing systems installed by others, was in a dire need of a full update after 15 years.
The first stage to be tackled was an upgrade and extension of the Rako lighting control system.
This included upgrading all scene set controllers, Hubs and connecting additional lighting to the system. We also integrated the clients existing Somfy blinds into the Rako system so they could be controlled from the same scene set controller.
Rear garden LED strip lighting was installed round all the raised beds which completely changed the look of the Garden.
There is still a lot to be done on this site over the coming months including Full network, Hifi, Control and VOIP TV system updates.